Description
315mm diameter polypropylene inspection chambers for adoptable and non-adoptable applications. Compliant with Sewers for Adoption 7th edition [SfA7].
Choice of eight base configurations for equal pipe connections.
For use directly with either 110/160mm plastic pipework or 150mm UltraRib system via the appropriate adaptor (6UR141).
315mm diameter shaft may be cut to length to achieve required invert down to a maximum of 2 metres.
Applications
- For above ground access and maintenance inspection of buried pipework down to 2 metres deep
- For loading applications:
- A15 (1.5 tonnes)
- B125 (12.5 tonnes) *
- D400 (40 tonnes) *
* With cover & frame supported by concrete plinth
Key Dimensions
- Invert depth of base:
- 238mm [for 110mm system]
- 290mm [for 160mm system]
- External shaft diameter: 315mm
- Shaft length: 2m
- Maximum installation depth: 2m
Key Features & Benefits
- Fast, easy installation: no wet trades
- Lightweight: no lifting equipment required
- Reinforcing ribs on underside to withstand groundwater pressure
- Shaft can be cut to required length
- No additional trench excavation required
Compliance
Range 315 chambers comply with the following standards and regulations
- BS EN 13598-2: 2009
- SfA7 Typical Chamber Detail – Type 4: (Non-entry. Maximum depth from cover level to soffit of pipe: 2m)
- Building Regulations – Part H1: Shallow only to maximum depth 0.6m